Managed to get hold of a lock up over winter and as the old girl is getting a bit tired thought it would be a good time to strip her down and have a tidy up.
Although the floor plan is solid it has never been under coated fully (only seals).
So plan is to drop the rear sub frame, powder coat and replace the bushes. same with tie rods
Replace leaky gasket on rear diff and clean it up
Drop and clean fuel tank and replace fuel lines
Replace the exhaust and bushes
Replace the lower arm bushes.
Leaving the engine in situ for the time being as its got 120k on the clock and bound to go bang in the not to distant future so will do the front end then.
Although the floor plan is solid it has never been under coated fully (only seals).
So plan is to drop the rear sub frame, powder coat and replace the bushes. same with tie rods
Replace leaky gasket on rear diff and clean it up
Drop and clean fuel tank and replace fuel lines
Replace the exhaust and bushes
Replace the lower arm bushes.
Leaving the engine in situ for the time being as its got 120k on the clock and bound to go bang in the not to distant future so will do the front end then.
Last edited by buckym120 on 18th April 2014, 12:36 pm; edited 1 time in total